大家都搜:
[电]负载功率
1、load more───加载更多
2、load view───负载视图
3、bacillary load───细菌负荷
4、docker load───码头装卸工
5、fire load───[安全]火灾荷载;燃烧负荷;燃料荷载
6、course load───课程负担
7、load───vi.[力]加载;装载;装货;vt.使担负;装填;n.负载,负荷;工作量;装载量
8、love load───爱的负荷
9、load board───搭载基板
1、and the front plugboard controls whether outputting a load power supply to the rear plugboard or not according to the detection result.───根据检测的结果控制是否输出负载电源给所述后插板。
2、Secondly, basing on analysis of network topology, "power - grid - load" power relations and the "network - network" relations are developed.───其次,基于网络拓扑分析理论,形成“电源-网架-负荷”供电关系及“网架-网架”联络关系;
3、Affection of Instantaneous Changeable Load Power Device Energy Loss and Removal───瞬变负荷对电力设备能耗的影响及消除
4、Automatic compensation load reactive power, enhancing the load power factor.───自动补偿负荷无功功率,提高负荷功率因数。
5、line power or prohibit access with load power, and the prohibition of live operation;───线路上禁止带负荷接电或断电,并禁止带电Cao作;
6、"Better Regulation" also according to different types of buildings to provide fire How? ? Power of one, two, three-load power requirements.───《建规》也按建筑物不同类别,规定其消防岂??电源分别为一、二、SanJi负荷供电要求。
7、load current is calculated from the supply voltage and the load power.───负载电流的计算应该根据工作电压和负载的功率计算。
8、India is a responsible nation and access to reliable base-load power generation is the key to boosting living standards, ' he said.───印度是个负责任的国家,能够以可靠的方式满足基本发电量需求是印度提高本国人民生活水平的关键。
9、II construction should be two two-circuit transmission line load power requirements.───二类建筑应按二级负荷的两回线路要求供电。
1、The no load power loss of the plate friction clutch in disengagement affects the transmission efficiency, the heat value and the life of the firection plates.
2、This control mode can effectively control phase difference of output voltage by the simulation, and circulating current can obviously be restrained, thus achieves the objective of sharing load power.
3、In order to achieve accurate measurement under normal load and lower load, this paper produces a project of three-phase watt-hour meter, with real-time subsection according to load power.
4、Pump surplus power so great, according to statistics is known that the central air-conditioning system, installed to run the actual peak load power needs than the general power to even the 15% -20%.
5、Resistive load, power factor: 1, special alloy resistance.
6、The voltage regulation has only 1% deviation and the voltage drop is only 4.7% of the nominal output voltage when the load power is from 20% to 100%.
7、The load current is calculated from the supply voltage and the load power ( or resistance ).
8、Therefore, the sensitivity of power flow of vulnerable cutset branch with respect to generator or load power can reflect the effectiveness of the sites where the emergency controls are enforced.
9、II construction should be two two - circuit transmission line load power requirements.