大家都搜:
高炉配装料
1、furnace stove───火炉
2、ovilia burden───ovilia负担
3、blast───n.爆炸;冲击波;一阵;vi.猛攻;vt.爆炸;损害;使枯萎;n.(Blast)人名;(德)布拉斯特
4、toy blast───玩具爆炸
5、furnace───n.火炉,熔炉
6、bejewel blast───宝石爆炸
7、electric furnace───电炉;电阻炉
8、burden rate───间接制造费用分摊率,间接费用分摊率,制造费用;负荷率
9、burden───n.(Burden)人名;(英)伯登;vt.使负担;烦扰;装货于;n.负担;责任;船的载货量
1、Study on Rational Design of Blast Furnace Burden───高炉炼铁合理配矿研究
2、Study and Application of High Level Sinter in Blast Furnace Burden───高比例烧结矿高炉炉料结构的研究与应用
3、APPLICATION: Apply to concrete mixer, Bitumen mixture equipments, equipments of converter or blast furnace burden and other equipments with burden need.───应用范围:混凝土搅拌设备、青混合料搅拌设备,冶金高炉、炉等需要配料的设备。
4、apply to concrete mixer, bitumen mixture equipments, equipments of converter or blast furnace burden and other equipments with burden need.───混凝土搅拌设备、沥青混合料搅拌设备,冶金高炉、转炉等需要配料的设备。
5、So the connotation of high-grade blast-furnace burden was proposed in this paper, and the scientific raw materials proportioning was also studied.───为此,本文提出高炉精料的内涵,研究了烧结科学配用矿的方法。
6、Lead vapor adsorption in blast furnace burden and effects on the metallurgical properties───高炉炉料吸附铅蒸气规律及对炉料冶金性能的影响
7、Controlling the size of blast furnace burden. . .───控制炉料粒度是提高高炉排铅率的有效措施。
8、Development and Application of Blast Furnace Burden Distribution Model───高炉布料数学模型的开发及应用
9、concrete mixer, bitumen mixture equipments, equipments of converter or blast furnace burden and other equipments with weighing and control need.───混凝土搅拌设备,沥青混合料搅拌设备,冶金高炉,转炉等设备中需要现场重量测控的XiTong。