大家都搜:
工程材料账单(engineeringbillofmaterial)
1、configured bom───配置的物料清单
2、bom cost───硬件成本
3、bogy bom───ZhaDan。
4、summarized bom───汇总物料清单
5、Bom begranate───好孩子
6、bom bom bom───物料清单
7、bom radar───bom雷达
8、bom bom───物料清单
9、bom dia───早上好。
1、Moreover, if the accuracy of the E-BOM data is insured until in the P5 stage, in which the design will be finished, the work of the next department will be affected and the program may be delayed.───而且,如果直到设计即将完成的P5阶段才能够保证E-BOM数据的准确性,也会影响下游部门的工作,很可能会造成项目延期。
2、Furthermore, it narrates the control scheme of coherence of E-BOM and M-BOM, and conducts the applicable verification in MRP system.───然后对天思mrpXiTong中实现E - BOM和M - BOM一致性的控制的方案进行论述,并在天思mrpXiTong中对方案进行应用验证。