大家都搜:
工程时间;维修时间;预检时间
1、engineering works───工程建筑物;机器制造厂
2、reverse engineering───[计]逆向工程
3、architectural engineering───建筑工程
4、eozone engineering───eozone工程
5、software engineering───[计]软件工程
6、agha engineering───agha工程
7、mining engineering───[矿业]采矿工程
8、transportation engineering───交通运输工程;运输工程(学)
9、verus engineering───维鲁斯工程公司
1、Application Study of Wavelet Analysis on Chemical Engineering Time- Space- Multiscale Problems───小波分析在化工过程时空多尺度问题上的应用研究
2、You only have so much engineering time to invest, so it's important to know you're spending it wisely.───因为你投入了大量的时间,需要知道你的投入是明智的。
3、Microsystems Engineering: Training for Industry in Microsystem Engineering (TIME)───微XiTong工程(在工业界应用)
4、Engineers can also develop their own reusable function blocks, further reducing engineering time and cost.───工程师们还可以开发他们自己的可再利用的功能板块,减少工程时间和成本。
5、This article introduces the thought and method of highway engineering time-cost optimization, and puts forward the CAD software design scheme.───介绍了公路工期—成本优化的思路和方法,并提出了公路工程工期—成本优化的CAD软件设计方案。
6、The decision to use a more conventional soft top will not only save on engineering time but will also keep the car's weight down.───决定使用一种更传统的软顶不仅节省工程时间,但也将保持汽车的体重下降。
7、CAD Software Design of Highway Engineering Time-cost Optimization───公路工程工期-成本优化的CAD软件设计
8、You only have so much engineering time to invest, so it's important to know you're spending it wisely.───你投入了大量的时间,需要知道你的投入是明智的。
1、Your organization invests a lot -- maybe your time for a week or fifteen months of engineering time or $385,000 of license fees -- in a piece of software.
2、Not only deformation was controlled, but also cost and engineering time were reduced.
3、Engineers can also develop their own reusable function blocks, further reducing engineering time and cost.
4、These eight equipments frequently appear various failures, for example, Assist, Setup, Engineering Time, Idle_lack of MS, Idle_lack work, and so on.
5、You only have so much engineering time to invest, so it's important to know you're spending it wisely.
6、This process requires a lot of engineering time, a base layer respin, and probably at least one metal spin on top of that.
7、In addition to cutting engineering time, the pre-engineered CEMAT modules and interfaces help shorten time to market and project cycles while reducing costs and increasing plant output.