大家都搜:
管道;导管
1、steel pipe───[材]钢管
2、pipe stem───管柱
3、main pipe───总管;主管道;[机] 总管; 主管道
4、tail pipe───n.排气尾管
5、pipe───vt.用管道输送;尖声唱;用管乐器演奏;n.(Pipe)人名;(匈)皮佩;(英)派普;n.管;烟斗;笛;vi.吹笛;尖叫
6、pipe dream───白日梦,空想;n.白日梦,幻想
7、line line───线条线条
8、lance pipe───钻管
9、ferruled pipe───套圈管
1、Thank you for your interest in the position of pipe-line design engineer.───谢谢您的兴趣在管道设计工程师的位置上。
2、As container shipping industry is in the end of the trade pipe-line, it takes longer time from recovery to prosperity.───集装箱航运业作为贸易产业链的末端,从复苏走向繁荣的路程将更晚。
3、Ground deformation induced by fault rupture gives a potential threat to the safety of infrastructures, pipe line systems and tunnels.───地层错动引起的基岩上覆土体变形对地表的建筑物、地下管线和隧道的安全带来潜在危险。
4、There is no water and most of the time pipe line and taps are stolen.───没有水,大多数时候管道或笼头被偷了。
5、Open the relevant valves on the oil pipe line and the water pipe line.───打开油管管路和水管管路上有关的阀门。
6、The plug frame is cylindrical and communicates with a pipe line disposed inside the endoscope.───栓壳是筒形,并在嵌合状态与配置于内窥镜内部的管路连通。
7、Before installing, flush pipe line to remove scale and debris.───安装之前,冲洗管道,清除水垢和碎片。
8、But to saddle the junction of the pipe line and groove cut, using manual cutting and grinding way, cutting quality, it is hard to guarantee.───但是对于马鞍形相贯线的管材及坡口切割,使用手工切割和打磨方式,切割质量就很难保证了。
9、Such valve can be used in medium, high pressure hydraulic and pneumatic pipe line of petroleum, chemical industry and power station.───本发明特别适用于石油、化工、电站等的中、高压液、气管道。
1、Open the relevant valves on the pipe line and the pipe line.
2、Protective gas system: pipe line from the protective gas generation station to reducing annealing furnace.
3、Before making mud, clean all the circulation pipe line and mud pits.
4、Kim Man-Hop PP-R, PE water supply pipe line will be green environmental protection, health, hygiene for the appointment, give your life a whole new feel.
5、Which is able to satisfy pipe line welding requirements.
6、Route length of ash pipe line - 4.0 Km.
7、Maximum continuous flow based on pipe line velocity of 20 ft . per second.
8、In the project of west to east gas pipe line, the CVN index are prescribed clearly that the sharpy impact energy should reach 120J, 85%.
9、Giant dunes of crushed rock and miles of mammoth piping line the road.