大家都搜:
n.管道工程
1、intrados of pipe───管道内拱
2、clay pipe stem───粘土管杆
3、rowdy roddy piper───罗迪·罗迪·派珀
4、pipe wrench───管扳手,管钳子;管扳钳;管子钳
5、tuberculated pipe───翅片散热管
6、pipe down───<口>安静下来;安静下来;吹哨停工
7、volumetric pipette───容量吸移管,移液吸管;移液吸管;容量吸移管
8、drive pipe───主动管,取样套管;套管;击入式管子;迫入管
9、pied piper───n.穿花衣的吹笛手,善开空头支票的领导者;n.穿花衣的吹笛手;善开空头支票的领导者
10、perculator water pipe───感知水管
1、All equipment will be bonded directly to the adjacent steel deck, no connections shall be made to pipework.───所有的设备将直接结合保护在邻近的钢板上,不需要管道连接。
2、Therefore, the volume down to the topmost perforation must be accurately known (from the tally and surface volume of pipework).───因此, (Xi Tong)准确了解下降到最顶层穿孔的体积。
3、Industrial pipework. Suction devices. Design requirements. Model for a technical sheet.───工业管道.吸气设备.设计要求的特征.技术登计卡样式
4、The stainless steel pipework has been constructed, tested, and inspected to very high standards.───此不锈钢管道工程已完成,以高标准测试检验过了。
5、Pumps do not actually suck ; rather , pumps create a partial vacuum into which atmospheric pressure pushes water via the suction pipework.───水泵并不是实际的吸:更确切的说,水泵产生非完全的真空,然后大气压力将水通过吸管推进水泵中。
6、Permanently installed pipework should be appropriately identified.───永久性安装的管道应当有相宜的标识。
7、industrial pipework . suction pipe for atmospheric pollutants . basic metal components . specifications.───工业管道。大气污染物吸入管道。基本金属部件。规范。
8、copper pipework has corroded in places.───铜管有几处受到了腐蚀。
9、Pipework, with the exception of plastic piping, quantities have been converted into tons and are shown in the BOQ's.───管道(塑料管道除外)数量已转化成吨,并列在BOQ中。
1、The copper pipework has corroded in places.