大家都搜:
abbr.接地 (Ground)
1、alarm gnd───警报接地
2、gnd yx rx───接地yx rx
3、adding items to hidden net GND───添加项目到隐藏网络GND
1、readback is correct, call when ready (for GND).───复诵正确,地面准备好叫。
2、A transistor is grounded not connected to GND without connection, thereby simplifying the replacement of data in the memory cell.───晶体管不与GND连接地接地,从而简化该存储单元中的数据替换。
3、Design GND Realization of Data Con.───数据一致性模型的设计与实现。
4、pin is the combined control circuitry and power ground.───脚是综合控制电路和电源地。
5、GND check found radome & R engine normal, engine fan blades & bypass normal.───地面检查雷达罩和右发进气道正常,右发风扇叶片正常,涵道正常。
6、If the record player is equipped with an earth lead connect it to the GND terminal of the unit.───该电唱机如备有接地线,则应将它与本机的接地端子连接起来。
7、LED current sense pin. Connect a resistor from main switching MOSFET source, ISNS to GND to set the maximum LED current.───LED电流检测脚。在主开关电路MOSFET的ISNS及GND脚间接入一个电阻可以对LED的最大电流进行设定。
8、Replaced nose gear shock strut charging valve , no leakage in GND check .───更换前起落架减振支柱充气活门,地面检查无渗漏。
9、CONNECT A JUMPER BETWEEN THE BATTERY TEMP SENSOR SIGNAL AND SENSOR GND CKTS.───电池温度感知器信号和感知器接地电路S之间设一条跳线。
1、GND:ground, the input signal is switched off and the attenuator is short to ground.
2、GND computing is an important new technology. Database System is needed for managing a large number of data on the grid.
3、Topics on aerodrome control at clearance delivery (DEL) and ground control (GND) level). S1 controllers must be enrolled in this course before promoting to S2.
4、In addition, to obtain the designed resolution distance, gnd lighting and good contrast are necessary.
5、EN enable control: when it connect to GND, the motor running; otherwise, the motor is stop.
6、For best performance, do not connect to GND directly at the part.
7、This new additive have advantage with a gnd effect of filtrate las reduction, easy adjusting thickening time, good rheological property, low water abeorption rate and suit for large temperature range.
8、A transistor is grounded not connected to GND without connection, thereby simplifying the replacement of data in the memory cell.
9、Device ground pins. All GND pins should be connected to the board GND plane.