大家都搜:
调度算法
1、dispatching software───调度软件
2、supervised algorithm───有监督算法
3、dispatching sop───调度sop
4、asystole algorithm───心脏停搏算法
5、dispatching───n.[交]调度;配送;安排作业;v.派遣;分派(dispatch的ing形式)
6、algorithm───n.算法,运算法则
7、dispatching certificate───调度证书
8、algorism algorithm───算法
9、dispatching jobs───分派作业
1、Two factors, which affect the performance of the content switching, is dispatching algorithm and routing mechanism.───内容交换性能好坏的两个关键因素是分发算法和转发机制。
2、Intelligent Dispatching Algorithm Considering Passenger Intermix-Degree for Elevator Group Control System───考虑乘客混杂度的电梯群控智能调度算法
3、Research And Implement of Dispatching Algorithm In Mold Job Shop───模具生产车间调度算法研究与实现
4、A recurrence algorithm of dynamic economic dispatching coupled with very short term load forecasting is presented.───本文提出一个与超短期负荷预报结合在一起的动态经济调度递推算法。
5、adaptive load dispatching algorithm based on a mapping table, AIHDA, is proposed.───负载分配问题,提出一种基于映射表的自适应负载分配算法aihda。
6、The real-time multi-media traffic dispatching algorithm of the private wireless communications system───专用无线通信XiTong实时多媒体业务调度算法的研究
7、Design of Dispatching Algorithm for Computer Automatic Dispatching System of Trucks at Open-pit Mines───露天矿卡车计算机自动调度XiTong调度算法设计
8、A Novel Economic Dispatching Algorithm with Unit Ramp Rate and Network Security Constraints───考虑机组爬坡速率和网络安全的经济调度新算法
1、A dispatching algorithm for VLSI processes is presented. Astrategy module and a schedule module are cooperated to arrange process steps into equipment queues.
2、Two factors, which affect the performance of the content switching, is dispatching algorithm and routing mechanism.
3、An adaptive load dispatching algorithm based on a mapping table, AIHDA, is proposed.
4、According to thses researches, it presents the priority dispatching algorithm and implement process.
5、The paper introduces database design theory, SCADA real-time data theory and flexible data interface briefly, and put forewords that using SCADA powerful script to design PBS dispatching algorithm.
6、For the job dispatching algorithm, the inductive learning method is used to discuss the production system status oriented rescheduling method.
7、A novel economic dispatching algorithm considering unit ramp rate. available transfer capability limitations of bothlines and transmission interfaces is advanced.