大家都搜:
炉墙
1、gas chamber───n.毒气室
2、chamber pot───n.尿壶,夜壶;夜壶;便壶
3、council chamber───n.会议室
4、exchequer chamber───财政会室法院,理财法院
5、wall to wall───遍地皆是
6、wall───n.墙壁,围墙;似墙之物;vt.用墙围住,围以墙;n.(Wall)人名;(英)沃尔;(德、芬、捷、瑞典)瓦尔;adj.墙壁的
7、chamber───n.(Chamber)人名;(英)钱伯;n.(身体或器官内的)室,膛;房间;会所;adj.室内的;私人的,秘密的;vt.把…关在室内;装填 (Dan Yao)
8、lower chamber───下闸室; 下议院;下院
9、air chamber───n.气囊,气胞; 气室
1、Both steady and transient temperatures on combustion chamber wall surface were measured under various working conditions.───同时,对油冷柴油机的燃烧室壁面进行了稳态和瞬态温度测试。
2、Measurement of Thermal Boundary and Influence of Combustion Flame on Thermal Boundary of Combustion Chamber Wall in a Diesel Engine───柴油机缸内壁面热边界层的测量及燃烧火焰影响的试验研究
3、Compare with the chamber wall on the right.───与珠孔的右侧作比较。
4、Precision stem and packing chambers. Straightness, roundness and fine finish of stem and packing chamber wall are essential.───精密加工的阀杆和填料腔。阀杆和填料腔壁的平直度、圆度和表面光洁度是最基本的要求。
5、Numerical simulation of combustion process in DI diesel with the secondary injection by combustion chamber wall───一种壁面二次PenShe柴油机燃烧XiTong数值模拟
6、Study of Resultants on the Chamber Wall in the Process of Dry Etching of Silicon Gratings───硅栅干法刻蚀工艺中腔室表面附着物研究
7、Scanning in a first direction is longitudinally through an aperture (55) in a vacuum chamber wall.───在第一方向上的扫描是纵向穿过在真空室壁上开口(55)。
8、Consolidating Forward Leaning Chamber Wall with Prestressed Soil Anchor───利用预应力土锚加固前倾的闸室墙
9、This paper introduces the mechanism and performance of silica mortar and its application in ship lock chamber wall repair engineering.───介绍硅粉砂浆的机理和性能及在修补船闸闸室墙的应用情况。
1、The calculation methods of lock chamber wall are mostly approximate with many assumptions, which still need proving both by theory and experiments.
2、An investigation on the effects of fuel injection parameters and chamber wall confinement on spray characteristics was conducted in a constant volume bomb by using the high speed laser shadowgraphy.
3、The fore-end of the chamber wall is thus cooled more effectively. Additionally, a larger injection angle reduces the peak temperature of the fore-end wall of the combustor.
4、Cell layers of powder chamber wall and middle-level were increased, tapetum cells were hypertrophied and sporogenous cells or microspore mother cells were disaggregated.
5、Straightness, roundness and fine finish of stem and packing chamber wall are essential.
6、The axial distribution of fuel vapor near combustion chamber wall surface can be improved by changing nozzle spray angle to improve engine combustion.